ZTD2120 Double-Arm Rock Drilling Cart
ZTD2120 is a double-arm rock drilling trolley designed for full construction methods such as multi-step and full section, which solves the shortcomings of traditional rock drilling trolleys that cannot meet the excavation and construction needs of multiple construction methods in a tunnel at the same time. It can not only meet the operation capacity of multi-step excavation and full-section excavation, so that the equipment can adapt to a wider range of excavation methods and working conditions, and redefine the value of tunnel multi-boom trolleys.
Product Introduction
Precise operation: maintain the retractable drill arm in all directions and parallel, and the positioning is fast and accurate; square structure form, high strength and good shock absorption performance;
Stable construction: The drilling system has the functions of anti-jamming, anti-hit and automatic retraction, which effectively improves the drilling efficiency and reduces the loss of drilling tools;
Safety protection: fully enclosed cab, meet FOPS requirements, equipped with heating and cooling air conditioning and oxygen concentrators, high comfort;
Intelligent control system: adopt intelligent control, a variety of operation modes are optional, can complete automatic drilling, automatic grouting and automatic installation of bolt operations, reducing the labor intensity of personnel;
Anchorage device: The bolt mechanism is compact and versatile, and can be used for the construction of pipe seam bolts and mortar bolts, and the large-capacity rod silo can be installed with a variety of bolts.
Parameter Configuration
Model(/):B6.7CS4
Power rating(KW): 194
brand(/): Cummins
| Parameter Name | unit | parameter | |
| motor | brand | / | Cummins |
| Model | / | B6.7CS4 | |
| Power rating | kW | 194 | |
| Emission standards | / | Country IV | |
| rock drill | brand | / | Montebay/Epiroc/XCMG |
| Model | / | HC109/18U/XHD20 | |
| Impact power | kW | 18/18/20 | |
| Drill arm | Telescopic stroke | mm | 2500 |
| Thruster compensation stroke | mm | 2000 | |
| Maintain parallel throughout the process | / | Yes | |
| Push the beam | Promote Chief Liang | mm | 7230 |
| Drill pipe length | mm | 5525/6400 | |
| Advance the drilling depth at one time | mm | 5140 | |
| Water system | Rated displacement | m3/h | 166 |
| Water pump power | kW | 7.5 | |
| gas system | Rated flow rate | L/min | 1030 |
| motor power | kW | 7.5 | |
| Electrical system | Total input power | kW | 165(2×75+7.5+7.5) |
| Motor power × quantity | kW | 55×2 | |
| voltage | V | 380 | |
| frequency | Hz | 50 | |
| Cable length | m | 80 | |
| chassis | Climbing ability | ° | 14 |
| Walking speed | km/h | 22.5 | |
| Hydraulic system | Main pump brand | / | Constant Power Hydraulic |
| Hydraulic tank volume | L | 750 | |
| pressure oil and oil return accuracy | 10 | ||
| Vehicle size | 运输状态 Shipping status | mm | 17264×2950×3400 |
| The working quality of the whole machine | t | 39 | |






